Are you about to load a container for Lagos and still unsure which SONCAP certificate your product actually needs, or whether the Form M will clear the bank before the vessel sails? This is the operating sequence as the exporter and importer have to execute it — which route fits your shipment pattern, what the accredited firm tests and inspects, what an authorised dealer bank sends back, how the PAAR figure is built, and what the whole chain adds to the landed cost of a 40ft container in 2026.

SONCAP, Form M and PAAR in Sequence: Seven Steps, and Who Owns Each One
Most broker diagrams stop at four steps and leave the reader at "PAAR issued", which is not the end of anything. The Standards Organisation of Nigeria publishes a longer chain, and each link has a different owner, a different platform, and its own clock.
# | Step | Who owns it | Where it happens | Clock |
|---|---|---|---|---|
1 | Register and activate the company TIN for trade | Nigerian importer | National Single Window trade portal | 1–3 working days, once per company |
2 | Product Certificate (PC) | Chinese exporter, with an appointed conformity firm | NSW application, certificate generated on the SON portal | 96 hours once the file is complete — the test report is the long pole |
3 | Form M | Importer, through an authorised dealer bank | CBN trade portal, then NCS UCMS | 3–7 working days after the bank validates |
4 | SONCAP Certificate (SC) | Exporter and conformity firm, activated by the importer | NSW | 96 hours after loading supervision |
5 | PAAR | Clearing agent, on the importer's mandate | UCMS (B'Odogwu) | Filed on final documents, before the vessel berths |
6 | Single Goods Declaration (SGD) | Clearing agent | UCMS (B'Odogwu) | On or after arrival |
7 | SON port release | SON port and border operations | Terminal | After assessment and payment |
Two things follow from that table. First, nothing in steps 2 to 4 can be done after the cargo has left China — SONCAP is an offshore, pre-shipment scheme, and the fallback for a shipment that sails uncertified is a default charge of 20% of CIF or ₦2 million, whichever is higher, before anyone discusses release. Second, the paperwork clock is not the factory clock: a supplier who finishes production on day 40 but has never obtained a test report cannot compress steps 2 to 4 into the ten days left before the sailing.
On DTFU's Nigeria bookings the chain is sequenced backwards from the booked sailing date, so the loading-supervision appointment is fixed before production is packed and the Form M is opened while the goods are still on the line. Starting at the vessel and working backwards is the only sequencing that survives a missed inspection. The carrier side of the same schedule — rotations, free time and terminal allocation — sits in Shipping From China to Nigeria.
Which SONCAP Route Fits Your Product: PC1, PC2 or PC3?
SON does not choose a route for you. The exporter and the appointed conformity firm agree on it, and the choice is a straight trade between upfront cost and how often you intend to ship the same product.
Route | Product certificate | Fee | Validity | What the conformity firm does | Fits when |
|---|---|---|---|---|---|
A | PC1 — Unregistered | $500 | 6 months, one shipment | Physical inspection and sample testing of every consignment | First shipment, new SKU, or a product you send once or twice |
B | PC2 — Registered | $1,000 | 12 months, unlimited shipments | QMS assessment plus a test report per product; selective inspections, first shipment always inspected | Repeat orders of the same models through the year |
C | PC3 — Licensed | $2,000 | 12 months, unlimited shipments | Factory audit and licensing; lightest routine inspection | A manufacturer with its own quality system shipping continuously |
The arithmetic decides most cases. A PC1 at $500 looks cheaper than a PC2 at $1,000 until you ship the second container: PC1 covers one shipment, so the testing and inspection cost repeats every time, while a PC2 covers every SC you raise inside its twelve months. Two or more shipments a year of the same models makes the registered route cheaper in cash and far cheaper in calendar time. PC3 is for factories that can already show a working quality system and want the inspection schedule out of their production planning.
There is a trap in the PC1 validity that catches exporters who read only the fee: it runs six months from issue but covers a single consignment. If the production slips past the sailing you planned, you are not extending a certificate — you are buying another one, and the samples are drawn again.
Another point that surprises Chinese suppliers: the PC is issued to the exporter and carries only the exporter's details, while the SC is issued to the importer and carries only the importer's. That is why a PC obtained for one Nigerian buyer can support a different buyer's SC, but an SC can never be reused for a second consignment or a second importer — SON limits each one to a single PAAR.
How a SONCAP Product Certificate Is Actually Obtained
Start by confirming the product is regulated at all. SON's scope is broad — chemical products, textiles, footwear, toys, electrical and electronic goods, mechanical products, kerosene stoves, and a long tail from hurricane lamps to brake pads. It explicitly excludes food, drugs, medical products other than equipment and machines, chemicals imported as raw material by bona fide manufacturers, military goods, contraband, and used products other than automobiles. Those exclusions matter commercially: a food importer is not escaping regulation, only moving to NAFDAC.
Then pick a conformity firm from SON's appointed list — eight firms operate the scheme, among them Cotecna, Bureau Veritas, China Certification and Inspection Group, China Hanson, China Standard Inspection, Africa Standards and Certification and two others. SON assigns no territory: any of them can inspect a factory in Guangdong or Zhejiang. The practical selection criteria are response time in your province and whether they will quote the testing charge in writing before you commit.
The file that goes in is the Request for Certification, the proforma invoice, product specifications and technical datasheets, and a test report. The test report is where first-time exporters lose weeks:
A report from an ISO/IEC 17025 accredited laboratory is accepted as the technical basis.
A manufacturer's own laboratory report is accepted only where the conformity firm witnessed the testing.
For PC2 and PC3, the manufacturer needs a quality management system in evidence — ISO 9001 is the usual proof.
Since the scheme's mandate renewal in May 2026, conformity firms have had more flexibility to accept a manufacturer's quality system combined with in-house test reports, provided the combination is documented in the file.
Samples are drawn by the conformity firm during the inspection or under its supervision, against the standard that applies to your product. Two operational rules follow. Samples must come from the production lot being shipped, not from an engineering prototype or a sample room unit — a report on a pre-production unit is the single most common reason a technical file is queried. And the number of units drawn is set by the standard, not by the firm's convenience, so confirm the draw in writing before the cartons are sealed; a lighting fitting and a generating set do not need the same sample set.
Then the inspection itself, and for full container loads, loading supervision. The conformity firm has to watch the container being loaded and seal it before the SC can issue. If your factory seals the box on a Friday afternoon and calls the inspector on Monday, the container is opened again, which means a re-inspection, a new seal, and a delay that usually costs more than the inspection fee.
Issuance is fast once the file is clean: SON's published service standard is 96 hours for a PC or an SC across time zones, and 24 hours where every document and test report is in order. The two-to-four weeks that importers actually experience is the test report, not the certificate.
Product Certificate vs SONCAP Certificate: Two Documents, Two Owners
The confusion between these two costs more money than any other misunderstanding on the lane, because the wrong one gets attached to the wrong application.
Product Certificate (PC) | SONCAP Certificate (SC) | |
|---|---|---|
Also called | PC1 / PC2 / PC3 by route | Certificate of Conformity, shipment certificate |
Issued to | The exporter | The importer |
Scope | A product or product family, with a model list | One consignment, one importer, one PAAR |
Validity | 6 months (PC1) or 12 months (PC2, PC3) | Per shipment, no reuse |
What it unlocks | Opening the Form M | Filing the PAAR and clearing the goods |
Who applies | Exporter, through the conformity firm | Exporter applies, importer activates on NSW |
Reusable across shipments | Yes for PC2 and PC3 only | Never |
Read the middle rows together: the PC gets you a Form M, and the SC gets you a container out of the port. An importer holding a valid PC and no SC has a shipment that cannot be cleared; an exporter holding an SC and an expired PC has nothing, because the SC cannot be raised without a live PC underneath it.
Opening Form M So the Bank Approves It Before the Vessel Sails
Form M is the import declaration that ties the transaction to a Nigerian entity, a bank, and a customs file. It is opened electronically through an authorised dealer bank, which validates it and transmits it onward; the bank issues a Bank Approval number, and from that moment the shipment has an identity that the PAAR, the bill of lading and the declaration must all match.
The bank is not a rubber stamp. It runs know-your-customer checks, compares the documents you upload against the originals it asks to see, and rejects anything it cannot reconcile. The recurring causes of a Form M coming back:
A generic goods description. "Spare parts" or "electronics" will not pass; the description must name the product, the model and the specification, and it must be the same wording that later appears on the invoice and the SC.
An HS code that does not match the goods described, or does not match the code on the product certificate.
A proforma invoice older than 90 days, which is the validity the trade portal gives a PFI.
A value that does not reconcile with quantity multiplied by unit price, or a unit price far outside the range for that product.
No electronic insurance certificate attached.
A SONCAP or NAFDAC certificate that exists as a PDF but has not been activated on the National Single Window, so the bank's check finds nothing.
An importer profile that is incomplete on the trade portal — an unregistered or dormant TIN stops the submission at step one.
The validity periods are worth memorising, because every one of them is a deadline that runs whether or not your production is on schedule:
Document | Validity | Extension | What a lapse costs |
|---|---|---|---|
Proforma invoice | 90 days | Reissue | Form M submission rejected |
Form M, general merchandise | 180 days | 180 days by the dealer bank, then CBN approval | Shipment cannot be declared against it |
Form M, plant and machinery | 365 days | 365 days by the dealer bank, then CBN approval | Same, with a longer runway |
PC1 | 6 months, one shipment | None | New certificate and new samples |
PC2 / PC3 | 12 months, unlimited SCs | Re-registration | New product charge of $350 |
SC | One consignment, one PAAR | None | That container cannot clear |
Two platform facts sit on top of this in 2026. Form M migration from the retired NICIS II system to the customs service's Unified Customs Management System — known as B'Odogwu — is free; the Nigeria Customs Service has stated publicly that no fee applies, so an agent billing for "Form M migration" is inventing a line item. And since 27 March 2026, SONCAP certificates must be activated on the National Single Window before they can be used for Form M, PAAR or cargo clearance, even though the certificate itself is still generated on the SON portal.
The export-side paperwork has to mirror the import file line for line — that is what a China customs clearance service is actually for on this lane. The check DTFU runs before a Form M is opened is a three-way comparison: model list against the certificate, description against the invoice, and HS code against the tariff line that will be applied to the PAAR.
What SONCAP, Form M and PAAR Cost: 2026 Rates, Fees and the Duty Stack
Compliance fees are small next to the freight and the duty, but they arrive at different times from different parties, which is why they get lost in budgeting. Here is the whole picture on one page, starting with the sea freight from China rates the compliance work rides on.
Mode | 2026 rate from China to Nigeria | What it covers |
|---|---|---|
FCL 20ft | $3,300–4,500 | Port to port, Lagos gateways |
FCL 40GP | $4,300–5,800 | Port to port, Lagos gateways |
FCL 40HQ | $4,500–6,000 | Port to port, Lagos gateways |
LCL | $110–165 per CBM | Consolidated, plus destination de-vanning |
Air | $4.20–6.50 per kg | Over 100 kg, Shenzhen or Guangzhou to Lagos |
Those bands are port to port; the container-size economics behind them are set out in 20ft and 40ft shipping from China to Nigeria. When the compliance clock will not fit an ocean rotation, air freight from China carries the same document set on a much shorter leg.
Certification is priced per certificate, not per container, and the schedule is published by SON:
SONCAP item | Fee | Notes |
|---|---|---|
PC1 — unregistered product | $500 | 6 months, one shipment |
PC2 — registered product | $1,000 | 12 months, unlimited SCs |
PC3 — licensed product | $2,000 | 12 months, unlimited SCs |
SONCAP Certificate (SC) | $350 | Per certificate, per consignment |
New product added to an existing file | $350 | Per product |
Amendment of a certificate | $100 | SON schedule; some conformity firms list $150 |
Non-conformity report | $350 | Issued when testing or inspection fails |
Extra model on the same certificate | $10 | Per model per month of validity, where covered by the same test report |
Testing is not in that table because SON does not set it: the conformity firm quotes it per standard and per model, and the number varies with how many tests the standard calls for. Ask for it in writing before production starts — a quote that omits testing is not a quote.
The statutory charges are where the real money is:
Charge | Base | Rate | On the example below |
|---|---|---|---|
Import duty | CIF customs value | 5–35% by HS line | $6,618 at 20% |
VAT | CIF plus duty | 7.5% | $2,978.10 |
Import levy (FCS) | FOB value | 4% | $1,120 |
SONCAP Certificate | Per consignment | $350 | $350 |
The 4% levy replaced the 1% Comprehensive Import Supervision Scheme and the 7% customs collection fee under section 18(1)(a) of the Nigeria Customs Service Act 2023. It was suspended by federal directive in September 2025, reinstated for 2026 with manufacturers exempted, and it is charged on FOB rather than CIF — which is why a quote still showing 1% CISS was built from a 2024 template. It is paid through the assessment, and an underpayment blocks the PAAR.
Now put it together. One 40ft high cube of LED lighting and rechargeable fans, four models, Shenzhen to Lekki, FOB $28,000:
Line | USD | Naira at ₦1,332 |
|---|---|---|
Goods, FOB Shenzhen | 28,000 | — |
Ocean freight, 40HQ to Lekki | 4,900 | — |
Marine insurance | 190 | — |
CIF customs value | 33,090 | 44,075,880 |
Import duty at 20% | 6,618 | 8,815,176 |
VAT at 7.5% on CIF plus duty | 2,978.10 | 3,966,829 |
Import levy at 4% of FOB | 1,120 | 1,491,840 |
SONCAP Certificate | 350 | 466,200 |
Destination terminal handling | 600 | 799,200 |
Customs brokerage | 300 | 399,600 |
Trucking to a Lagos warehouse | 260 | 346,320 |
Landed total | 45,316.10 | 60,361,045 |
The duty line is the swing factor, and it is decided by the tariff line, not by negotiation. The same container at a different classification:
CET rate | Duty | VAT | Landed total | Naira at ₦1,332 |
|---|---|---|---|---|
5% | 1,654 | 2,606 | 39,980 | 53,253,813 |
10% | 3,309 | 2,730 | 41,759 | 55,622,881 |
20% | 6,618 | 2,978 | 45,316 | 60,361,045 |
35% | 11,582 | 3,350 | 50,652 | 67,468,278 |
Two footnotes belong on that table. The naira figures use the CBN rate applied on the assessment day — ₦1,332 in October 2026 — while the parallel market sat nearer ₦1,390, so the cost of actually buying the dollars is higher than the assessment implies. And the tariff line is fixed by the ECOWAS CET as amended by the 2026 Fiscal Policy Measures, so a classification argument is won with a technical datasheet and a General Interpretative Rule, not with a lower invoice.
How PAAR Is Derived From Your Final Documents — and Why the Assessment Differs
The Pre-Arrival Assessment Report is customs' own calculation of what the consignment owes, produced before the vessel berths. It is generated from the final documents (the structure that shifts this work to the forwarder is what DDP Shipping from China to Nigeria prices): the approved Form M with its Bank Approval number, the commercial invoice, the packing list, the bill of lading showing the Form M number, the Combined Certificate of Value and Origin, the activated SC, and the insurance certificate.
The Combined Certificate of Value and Origin deserves its own sentence, because it is the document Chinese suppliers most often have never issued. It combines the value declaration and the origin statement in the single form Nigerian banks and customs accept, and a shipment without it stalls at PAAR regardless of how good the invoice is.
Once the file is complete, the assessment is an application of the valuation rules in the customs service's 2026 valuation guide, and those rules explain most of the gaps importers complain about:
The customs value is the transaction value — the price actually paid or payable — not a database figure and not the highest of several numbers. Minimum values and arbitrary values are expressly prohibited.
Additions are made where the buyer bore the cost and it is not already in the price: transport to the Nigerian port, loading and handling for that transport, insurance, commissions other than buying commissions, packing, assists supplied free or at reduced cost, and royalties paid as a condition of sale.
Foreign-currency invoices are converted at the official CBN rate applicable when the declaration is submitted. B'Odogwu does not set that rate; the Central Bank does. A vessel that berths three weeks after your calculation can therefore produce a different naira bill on an identical dollar value.
The system also carries the charges that sit outside duty: the 4% levy on FOB, the Green Tax Surcharge on vehicles of 2,000cc and above introduced in the July 2026 measures, and any Import Adjustment Tax line on your tariff heading.
So the assessment differs from your declaration for one of five reasons: a different HS classification, an addition you left out (freight and insurance when you bought FOB), a quantity that does not match the packing list, a different exchange rate on a different day, or a charge you did not know existed. Each has a different fix, and none is fixed by arguing about the invoice alone.
If you disagree, the rights are specific. Customs must tell you the grounds for doubting your value, in writing if you ask, and give you a reasonable opportunity to respond. You can appeal a valuation without penalty, with a final appeal to a court always open. And a valuation dispute does not have to hold the cargo: you can take delivery against a surety or deposit covering the potential duty. Those three provisions are in the customs act, not in a broker's discretion, and a forwarder who does not know them will let your container sit while the file is argued.
When the SC Quantity or Model List Does Not Match the Invoice
This is the expensive one, and it is almost always a substitution rather than a fraud: the factory runs short of one model, ships a similar one instead, and tells nobody until the container is on the water.
The SC is written against a certificate that names a product family and a model list, and it covers a stated quantity for one consignment. Three separate mismatches flow from that:
A model that is not on the certificate. The SC cannot cover it, the conformity firm issues a Non-Conformity Report at $350, and a corrected certificate follows only after the technical basis for that model is established — which may mean a test report you do not have.
More units than the SC states. The excess is uncertified cargo. Shipping at or below the certified quantity and putting the balance on the next certificate is always cheaper than discovering the overage at the terminal.
A second importer or a split shipment. One SC covers one PAAR for one entity. Split the container across two buyers and you need two certificates, at $350 each.
The arithmetic on a mid-production substitution is worth walking through, because a $10 saving per model reads very differently at the port. On the 40HQ above, one substituted model means: a non-conformity report at $350, a replacement certificate at $350, a re-inspection and resealing of the container, and the days the box spends waiting — at $40 to $75 per container per day once the 7 to 14 day free window closes. Five waiting days at $55 is $275, and a week of missed sales on a fast-moving line usually dwarfs all of it. Against that, the compliant options cost $100 for an amendment, or $10 per model per month of validity to add the model to the certificate in the first place.
The worst case is not a delay. Goods that arrive without a valid SC for the actual contents fall under the SONCAP default: 20% of CIF or ₦2 million, whichever is higher, on the example container that is $6,618 — the entire duty line, paid again — before detention, testing and possible destruction at the importer's expense are even discussed.
NAFDAC, SON or Neither: Which Regulator Owns Your Product
The question is not whether your product is regulated but by whom, and the answer decides which certificate sits inside the Form M.
Product category | Regulator | Document needed | When it is needed |
|---|---|---|---|
Electrical and electronic goods, machinery, textiles, footwear, toys, auto parts, building materials | SON | PC before Form M, SC before PAAR | Before shipment, always |
Food, drugs, cosmetics, medical devices, packaged water, chemicals for consumption | NAFDAC | Product registration plus import permit or Form M authorization | Weeks before the Form M is opened |
Raw materials imported by a bona fide manufacturer | SON import permit rather than certification | Import permit | Before Form M |
Used vehicles | SON, plus the vehicle regime | SC for automobiles, Green Tax Surcharge above 2,000cc | Before shipment |
Used goods other than automobiles | Outside SONCAP scope | None from SON | — |
NAFDAC is the schedule risk in that table. Its guideline on authorization to open Form M is written for specific categories — frozen fish, packaging materials for regulated products, fresh fruit, raw and unprocessed seeds and vegetables, and borderline products — not as a universal rule, so the correct step is to identify which NAFDAC procedure your exact product falls under rather than assuming the generic one. Registration and permit processing commonly runs two to eight weeks, which is longer than most production cycles and must be started before the purchase order, not after it.
What Changed in Nigeria Import Clearance in 2026, and What Dates a Forwarder's Paperwork
Nigeria's import machinery changed three times in eighteen months, which is why so much of what ranks on this topic is quietly out of date. Use this list to test any quote or procedure you are handed.
Change | What it means for your shipment | What to check |
|---|---|---|
National Single Window go-live, 27 March 2026 | SONCAP applications and import permits move to the NSW; certificates must be activated there before Form M, PAAR or clearance | Your agent's profile and activation step exist on nsw.gov.ng |
B'Odogwu (UCMS) replaces NICIS II | Form M, PAAR, declaration, assessment and release run on one customs platform; Form M migration is free | No invoice line for "Form M migration" |
4% FOB import levy | Replaced the 1% CISS and 7% collection fee; suspended September 2025, reinstated for 2026, manufacturers exempted | A quote showing 1% CISS is a 2024 template |
Cotecna mandate renewed 1 May 2026 | Route B inspection frequency becomes four inspections a year with the first shipment mandatory; broader acceptance of documented in-house testing | Your conformity firm's current route terms, not a 2025 PDF |
2026 Fiscal Policy Measures, July 2026 | Revised Import Adjustment Tax and National List under the ECOWAS CET 2022–2027; Green Tax Surcharge on vehicles 2,000cc and above | The tariff line on your PAAR, not last year's duty estimate |
A forwarder who still describes documents being couriered to Abuja, or who quotes CISS at 1%, is working from a process that ended. That is not a small administrative detail: the levy difference alone is three percentage points of FOB, and on a $28,000 shipment it is $840 that either appears in your landed cost or does not.
Nigeria Import Compliance Timeline: Counting Back From Vessel ETA
The chain works when it is planned backwards from the sailing, not forwards from the purchase order. A workable sequence for a first shipment of a regulated product:
When | What must be finished | Owner |
|---|---|---|
T-70 days | Product confirmed as SONCAP-regulated; conformity firm appointed; test scope quoted | Exporter and importer |
T-60 days | Samples drawn and sent to an ISO/IEC 17025 laboratory | Exporter |
T-35 days | Test report in hand; PC applied for and issued within 96 hours | Exporter and conformity firm |
T-30 days | PC activated on the NSW; Form M opened with the PFI and e-insurance certificate | Importer and bank |
T-25 days | Form M approved, Bank Approval number issued | Bank |
T-15 days | Production complete; loading supervision booked with the conformity firm | Exporter |
T-10 days | Container loaded under supervision, sealed, SC requested on the RFC form | Exporter and conformity firm |
T-7 days | SC issued and activated; bill of lading issued showing the Form M number | Exporter, importer |
T-5 days | CCVO, final invoice, packing list and SC submitted; PAAR filed | Clearing agent |
ETA | PAAR issued; SGD lodged; duty, VAT and levy assessed and paid | Clearing agent |
ETA + 5 to 10 days | Release and evacuation from Lekki, or longer through the Apapa corridor | Clearing agent |
Two realities sit outside the table, and both are already built into the door-to-door shipping from China timelines carriers publish. Transshipment adds seven to ten days on the water via Singapore, Port Klang, Colombo, Tangier or Jebel Ali, and LCL adds roughly ten to thirteen days over FCL because of origin consolidation and destination de-vanning — so the compliance clock should be anchored to the actual berth date, not the booking date. And demurrage starts when the free window closes, typically seven to fourteen days after discharge, at $40 to $75 per container per day; a compliant file that arrives with the vessel is worth more than a cheaper certificate that arrives a week late.
Frequently Asked Questions
How much does SONCAP cost in 2026?
A PC1 is $500, a PC2 $1,000 and a PC3 $2,000; the SONCAP Certificate is $350 per consignment. Add the conformity firm's testing charge for your standard, which SON does not set, plus $350 for a new product, $100 for an amendment, $350 for a non-conformity report and $10 per extra model per month of validity.
How long does SONCAP take?
SON's service standard is 96 hours for a PC or SC, or 24 hours when the file is complete and every test report is in order. The real constraint is the test report, which runs two to four weeks for a product with no recent report from an ISO/IEC 17025 laboratory.
Can I apply for SONCAP after the goods have left China?
No. SONCAP is an offshore pre-shipment scheme and cannot be processed once the consignment has departed. The applicable charge at that point is the SONCAP default of 20% of CIF or ₦2 million, whichever is higher, plus detention and testing at the importer's expense.
Does every product imported into Nigeria need SONCAP?
No. SON's scope covers most manufactured goods but excludes food, drugs, medical products other than equipment, chemicals imported as raw material by bona fide manufacturers, military goods, contraband and used goods other than automobiles. Food, drugs and cosmetics move to NAFDAC instead.
Can one SONCAP Certificate clear two containers?
No. One SC covers one consignment and one PAAR, and is issued to one entity. Two containers sailing on two bills of lading need two certificates at $350 each, even when they carry identical goods.
Must Form M be approved before the vessel sails?
Yes — the Form M has to be opened and approved for the shipment to be declared at all, and the PC that supports it has to exist first. Form M runs 180 days for general merchandise and 365 days for plant and machinery, with one extension available from the dealer bank.
What is the 4% import levy and does it apply to me?
It is the Financing Customs Service levy under section 18(1)(a) of the Nigeria Customs Service Act 2023, charged at 4% of FOB. It replaced the 1% CISS and the 7% collection fee, was suspended in September 2025, and was reinstated for 2026 with manufacturers exempted. On a $28,000 FOB shipment it is $1,120.
Why is my PAAR higher than my invoice?
Usually one of five things: a different HS classification, an addition such as freight and insurance when the terms were FOB, a quantity that does not match the packing list, a different CBN rate on the assessment date, or a charge outside duty such as the 4% levy or an Import Adjustment Tax line.
Can I challenge a customs valuation?
Yes. Customs must state its grounds in writing on request, the first appeal carries no penalty, and a final appeal to a court is always available. You can also take delivery against a surety or deposit while the value is disputed, so the container does not sit on demurrage.
What does duty and VAT actually add to a 40ft container?
On a $33,090 CIF value at a 20% tariff line: duty $6,618, VAT $2,978.10 and the 4% FOB levy $1,120, so $10,716 in statutory charges before clearance costs — roughly ₦14.3 million at ₦1,332.
Do I need NAFDAC as well as SONCAP?
Only if the product is food, a drug, a cosmetic, a medical device or a chemical for consumption. NAFDAC registration and the import permit or Form M authorization take two to eight weeks depending on category, and they happen before the Form M, not after.
Is there a fee to migrate Form M to B'Odogwu?
No. The Nigeria Customs Service has stated publicly that Form M migration from NICIS II to the Unified Customs Management System is free. A charge for it on an invoice is a red flag about everything else on that invoice.
If you are weighing a shipment against this sequence and something in your file does not line up — an unregistered model, a PC that expires before the sailing, a Form M description your supplier cannot match on the invoice — contact us with the product list and the target sailing date. DTFU runs that document check before the booking is confirmed, raises the certificates through the conformity firm, and files the PAAR while the vessel is still at sea, so the only queue your container joins at Lekki is the one for the gate. The same sequence applies on the neighbouring lanes collected under Shipping from China to Africa, with the regulator and the duty base changed to suit the destination. For the freight side of the same shipment, the sea shipping cost from China to Nigeria table and the shipping time from China to Nigeria breakdown answer the two questions that usually come next.